SURFACE CUT & CAP PROPOSAL

CUT & CAP ARC RESOURCES LTD. 100/10-28-063-05W6/02

Prepared for ARC Resources Ltd. A field-ready plan for one surface cut and cap using Innovative Well Abandonment's ultra-high-pressure cutting system.

01

Wellbore

Surface abandonment scope

01

Licence

Included in this program

01

Project Day

Including mob / demob

View Rate ScheduleContacts

Compliant

SafetySync
COR Workplace Safety
ISNetworld Member Contractor
ComplyWorks
Avetta
WorkSafeBC
WorkHub
8AM

01 — Project Area

Single-Well Footprint

ARC Resources Ltd. well Licence: #0434110.

CUT & CAP

Below-Grade Wellhead

7GEN HZ KAKWA 10-28-63-5

The wellhead currently sits approximately 13 feet below the existing ground surface, as the lease has been built up over time.

02 — Rates

Equipment & Rate Schedule

Itemized project estimate showing the supplied units, quantities, rates and extended totals.

Primary Equipment

UHP CUTTING TRUCK & ALL CONSUMABLES

$3,000.00

$3,000.00 / Well × 1

Logistics & Mobilization

  • Cut Truck Crew & Travel

    Hourly × 12 at $375.00

    $4,500.00

  • 16' Dump Trailer

    Daily × 1 at $500.00

    $500.00

  • Support Truck Mobilization/Demobilization

    KM × 1,028 at $1.75

    $1,799.00

  • Subsistence

    Day × 3 at $275.00

    $825.00

In efforts to keep travel costs down we strive to find other projects in the area.

Estimated Project Total

Based on the units and quantities listed above.

$13,707.50

03 — Assumptions

Assumptions & Conditions

The basis of estimate for this proposal, including access, schedule and operating conditions.

Rates & Surcharges

No fuel surcharge apply. Standard daylight operating hours apply. There will be no overtime.

Estimate Basis

The project estimate is based on the units, quantities and rates listed in the supplied schedule, including mobilization and demobilization. Anything outside of IWA's control will be billed at the standby rate listed in rate schedule. 

REGULATORY

D20-compliant as per AER regulations along with digital records with attached visual evidence.

04 — Contacts

Contacts & Next Steps

Leads on both sides of the project, and what has to close before the crew mobilizes.

Client

ARC Resources Ltd. logo

ARC Resources Ltd.

Address

1500, 308 4 Ave SWCalgary, Alberta T2P 0H7
DS

Danielle Siemens R.T.Ag

Senior Environmental Coordinator | ARC Resources Ltd.

O:780-512-2096C:780-882-5991dsiemens@arcresources.com

Contractor

Innovative Well Abandonment logo

Innovative Well Abandonment

Address

11630 Kingsway NW,Edmonton, Albert T5G 0X5
Scott Bowes portrait

Scott Bowes

President — Primary Contact

780-808-1349sbowes@innovativewa.com
Chris Hamilton portrait

Chris Hamilton

Business Development Manager

403-630-1243chamilton@innovativewa.com
Next Step

Confirm access, approve estimate, mobilize

01

Assessment

02

Approval

03

Mobilize